Roof sheeting installers: what a complete quote should cover

Scope first, then price. Free quotes from suppliers, roll formers, cut to size shops, fabricators and installers across South Africa: one request, no obligation.

Services and guides. For new roofs and re-roofs.

A house roof half re-sheeted, with new grey ribbed steel sheets on one side and old weathered sheets on the other, scaffolding along the gutter line

Two quotes to re-sheet the same roof can differ by a wide margin, and the cheaper one often leaves things out. Before comparing prices from roof sheeting installers, get each of them to list the full scope in writing: what comes off, what goes on and who carries the old sheets away. Then the figures can be set side by side honestly, and nothing becomes a surprise extra halfway through the job.

Price guide

Quoted per job.

The drawing or the roof, the material, the quantity and the travel change the price too much for a fair published range. Ask for a written quote that lists every item.

What should a complete roofing scope list?

  • Stripping the old sheets and taking them to a licensed dump.
  • Checking purlins and trusses, and replacing rotten or bent members.
  • The new sheets: profile, coating, thickness and colour, cut to length.
  • Insulation or a reflective underlay, if wanted.
  • Ridge capping, side and barge flashings, and flashings at walls and chimneys.
  • Gutters and downpipes, new or refitted.
  • Sweeping swarf off the sheets and clearing the site.

The roof sheeting page explains each material choice.

Who carries the risk of working on my roof?

Roof work is dangerous. Commercial and larger jobs fall under the Construction Regulations, which call for a fall protection plan, harnesses and a competent person in charge. On a house, ask how the team will stop a fall: scaffolding, edge protection or anchor points. Old fibre cement and plastic sheets break underfoot. If the old roof may be asbestos cement, leave it alone; removal belongs to a registered asbestos contractor.

Do I need plans for a new roof?

A new roof, a new carport or an enclosed stoep commonly needs approved building plans under the building regulations. Replacing sheets like for like on an existing roof often does not, but check with your municipality before work starts. A change of pitch or a much heavier roof may also need an engineer. On a new house, the builder deals with the home builders' regulator; ask your roofer to work to the approved drawings and keep the inspection dates in mind.

What can I check from the ground?

Stay off the roof. From the yard or a ladder at the gutter you can see straight sheet lines, fixings in neat rows, and ridge and flashings finished cleanly. Look for orange specks of rust from swarf left behind. Our roof sheeting calculator lets you check the number of sheets on the quote.

Who asks for this

Homeowners and DIY
Re-sheeting a rusted house roof, a new carport or roofing over a back stoep.
Builders and contractors
Subcontracted sheeting crews on new houses, extensions and social housing projects.
Farms and smallholdings
New sheds, re-roofing old barns and fixing storm damage on stables and stores.
Factories and workshops
Re-roofing a warehouse while it keeps working, with fall protection plans in place.
Shopfitters and signwriters
Roofing over a shopping centre walkway or replacing leaking sheets above a store.
Schools, clinics and municipalities
School, clinic and church roofs, often on a tender with set safety paperwork.
Mines and plants
Plant building roofs and conveyor covers, under strict site safety rules.
Resellers, fabricators and installers
Installers quoting on materials from a roll former and hiring extra crews for big jobs.

Frequently asked questions

What warranty should a roofer give?

Ask for a written warranty on the workmanship, separate from the sheet maker's guarantee on the coating. It should say how long it runs, what it covers, such as leaks at laps and flashings, and how to claim.

Should I pay a deposit?

A deposit towards materials is common. Avoid paying the full amount up front, and link later payments to stages you can see, such as stripping done and sheets on.

How long does a re-roof take?

An average house is often stripped and re-sheeted in a few days if the timber is sound. Rain, rotten purlins and access can stretch that, so ask how the roof will be kept dry overnight.

Can the installer supply the sheets?

Most do, ordering cut lengths from a roll former. You can buy the sheets yourself, but then length errors and shortages land on you. The sheeting prices guide helps you read a supply and fit quote.

Work it out first

More sheeting topics

Get a quote for roof sheeting installers

Fill in the order sheet: the material, how much, the sizes, where you are and by when. Suppliers, cut to size shops, fabricators and installers in your area quote you directly. It is free and there is no obligation.

Order sheet forRoof Sheeting Installers
Order
No. 1875
Status
Not sent

The request

The job optional, it helps the quote

Cut list line-

The list optional

Up to 12 lines: lengths, sizes, flashings, fixings.